Brief: Discover the 219mm MK5E Overburden Concentric Casing Drilling System with DHD 360 Hammer, designed for construction projects like water wells, geothermal wells, and micro piles. This high-performance drilling tool ensures fast penetration rates, straight holes, and reliable performance. Perfect for building, dam, and harbor projects.
Related Product Features:
Designed for water wells, geothermal wells, and micro piles with a casing pipe OD of 219mm.
Matched with Hammer DHD360 for superior drilling performance.
Ensures straight holes and fast penetration rates for efficient drilling.
Investimento ridotto con alta produttività per progetti di costruzione.
Suitable for medium mini-type grouting holes in building, dam, and harbor projects.
Offers stable and reliable performance with high drilling speed.
Compatibile con vari diametri di riaming e diametri di involucro per un uso versatile.
Opzioni di consegna rapide disponibili con disponibilità di magazzino per una rapida evasione.
Interrogazioni:
Come ordinare il foratore MK5E?
Fornire il diametro esterno e interno del tubo di rivestimento, il diametro della punta alesatrice, il diametro interno minimo del bocchettone di rivestimento e lo stile dell'asta del martello per l'ordine.
Qual è il metodo di imballaggio comune per il prodotto?
Il prodotto viene imballato prima in scatole di piccole dimensioni e poi in scatole più grandi per garantire una consegna sicura, a meno che non sia richiesto un imballaggio speciale.
What is the delivery time for the MK5E Overburden Casing Drilling Bit?
Production typically takes 25 days, but if the requested size is in stock, delivery can be completed in 3 to 5 days.
How does the casing advancer work?
The Casing Advancer allows drilling and casing to be performed simultaneously, eliminating the need to drill and ream separately, thus saving time and effort.