Brief: Discover the 219mm MK5E Overburden Concentric Casing Drilling System with DHD 360 Hammer, designed for construction projects like water wells, geothermal wells, and micro piles. This high-performance drilling tool ensures fast penetration rates, straight holes, and reliable performance. Perfect for building, dam, and harbor projects.
Related Product Features:
Designed for water wells, geothermal wells, and micro piles with a casing pipe OD of 219mm.
Matched with Hammer DHD360 for superior drilling performance.
Ensures straight holes and fast penetration rates for efficient drilling.
Baixo investimento com alta produtividade para projetos de construção.
Suitable for medium mini-type grouting holes in building, dam, and harbor projects.
Offers stable and reliable performance with high drilling speed.
Compatível com vários diâmetros de revestimento e diâmetros de carcaça para utilização versátil.
Opções de entrega rápida disponíveis com disponibilidade de estoque para rápida entrega.
Perguntas frequentes:
Como encomendar o MK5E Overburden Casing Drilling Bit?
Fornecer o tubo de revestimento OD & ID, o diâmetro do reamer bit, o ID mínimo do calçado do revestimento e o estilo Hammer Shank para encomenda.
Qual é o método comum de embalagem do produto?
O produto é embalado em caixas pequenas primeiro, depois colocado em caixas maiores para garantir a entrega segura, a menos que embalagem especial seja solicitada.
What is the delivery time for the MK5E Overburden Casing Drilling Bit?
Production typically takes 25 days, but if the requested size is in stock, delivery can be completed in 3 to 5 days.
How does the casing advancer work?
The Casing Advancer allows drilling and casing to be performed simultaneously, eliminating the need to drill and ream separately, thus saving time and effort.