|
Product Details:
|
| Matched Hammer: | Hammer DHD360 | Procession: | Forging,Machining Process |
|---|---|---|---|
| Usage: | Hole Drilling, Mining&Construction&Water Well Drilling | Application: | Mining And Construction |
| Powersource: | Diesel Engine / Electric Motor | Model Shank: | CIR Shank |
| Mobility: | Crawler Mounted / Wheeled | Advantage: | High Performance, High-efficiency, Widely Used Hard Rocks And Have Good Penetration |
| Highlight: | carbide alloy overburden drilling system,electric motor drilling system for mining,mining construction overburden drilling equipment |
||
The Overburden Drilling System is a highly efficient and robust solution designed specifically for mining and construction applications. Engineered to meet the demanding needs of overburden removal, this system combines advanced technology with durable materials to deliver exceptional performance and reliability in the field. Whether you are engaged in large-scale mining operations or complex construction projects, the Overburden Drilling System offers the precision and power needed to streamline your drilling processes and improve overall productivity.
At the heart of this system is the Overburden Drilling Rig, a powerful and versatile piece of equipment that serves as the foundation for effective overburden removal. The rig is available with either a Diesel Engine or an Electric Motor power source, enabling operators to select the option that best suits their operational environment and energy availability. The diesel-powered rigs provide high torque and mobility, making them ideal for remote or off-grid locations. Conversely, the electric motor variants offer quieter operation and reduced emissions, perfect for environmentally sensitive sites or indoor construction areas.
The Overburden Drilling System Unit is meticulously constructed from high-quality materials to ensure durability and long service life. Key components are made from High Manganese Steel, known for its exceptional toughness and resistance to abrasion, making it well-suited for the harsh conditions typically encountered in mining and construction sites. Additionally, carbide elements are incorporated into critical parts of the drilling tool to enhance cutting efficiency and maintain sharpness over extended periods of use. This combination of materials guarantees that the system can withstand the rigors of continuous operation without frequent maintenance or part replacement.
One of the defining features of this system is the use of the CIR Shank model for the drill bits. The CIR Shank design provides superior stability and secure attachment between the drill bit and the hammer, minimizing vibrations and improving drilling accuracy. This results in faster penetration rates and reduced wear on the equipment, ultimately lowering operational costs and downtime. The shank’s compatibility with a range of hammer types also adds versatility to the Overburden Drilling System, enabling it to adapt to different rock formations and site conditions.
The hammer type specifically designed for this Overburden Drilling System is optimized to deliver maximum impact energy while maintaining efficient energy transfer to the drill bit. This ensures rapid fracturing of overburden layers, facilitating quicker removal and preparation of the site for further excavation or construction activities. The hammer’s robust construction, combined with the advanced materials used in the drilling tool, makes the entire system exceptionally reliable even under the most challenging conditions.
In summary, the Overburden Drilling System is a comprehensive and powerful solution tailored to the needs of modern mining and construction industries. Its combination of a versatile Overburden Drilling Rig powered by Diesel Engine or Electric Motor, high-strength materials including High Manganese Steel and carbide, and the precision-engineered CIR Shank model results in a highly effective Overburden Drilling Tool. This system unit ensures enhanced productivity, durability, and operational efficiency, making it an indispensable asset for projects that require efficient and reliable overburden removal.
| Mobility | Crawler Mounted / Wheeled |
| Drill Speed | 0-100 Rpm |
| Advantage | High Performance, High-efficiency, Widely Used Hard Rocks And Have Good Penetration |
| Material | High Manganese Steel, Carbide |
| Procession | Forging, Machining Process |
| Usage | Hole Drilling, Mining & Construction & Water Well Drilling |
| Model Shank | CIR Shank |
| Materials | Steel, Carbide Alloy |
| Matched Hammer | Hammer DHD360 |
| Application | Mining And Construction |
The MING Overburden Drilling System is a highly efficient and reliable solution designed for various overburden drilling applications. Originating from China and certified with ISO9001, this overburden drilling machine boasts superior quality and advanced technology, making it an ideal choice for both industrial and commercial drilling needs. With a supply ability of 2000PCS per month and a minimum order quantity of just 1PC, it caters to diverse customer requirements worldwide.
This Overburden Drilling System Unit is perfectly suited for mining, construction, and geological exploration scenarios where rapid and precise removal of overburden soil is essential. Whether the task involves preparing ground for mining operations or conducting soil sampling for environmental assessments, the system delivers outstanding performance. Its matched hammer, the Hammer DHD360, and the adjustable drill speed ranging from 0-100 Rpm ensure optimal drilling efficiency across different soil conditions.
The system’s flexible power source options, including Diesel Engine and Electric Motor, allow for adaptability in various field environments, ensuring uninterrupted operation regardless of site constraints. The CIR Shank model design enhances durability and ease of use, while the robust hammer type tailored for overburden drilling guarantees effective penetration and soil extraction. These features make the Overburden Soil Drilling System especially suitable for rugged terrains and demanding drilling tasks.
Packaging is handled with utmost care, utilizing sturdy wooden cases to protect the equipment during transit, ensuring it arrives in pristine condition. With a competitive price range of 999-99999 USD per piece, the MING Overburden Drilling System offers excellent value for investment. Delivery times range from 3 to 5 weeks, depending on order size and specifications, supported by flexible payment terms including T/T, D/P, and Western Union.
In summary, the MING Overburden Drilling System is designed to meet the needs of industries requiring reliable overburden soil drilling solutions. Its advanced features, robust build, and versatile application occasions make it an indispensable tool for overburden drilling operations in mining, construction, environmental studies, and geological surveys. Choosing this overburden drilling machine ensures efficiency, durability, and precision in overburden removal tasks.
Contact Person: Ms. Wendy Chen
Tel: 0086 13685829633
Fax: 86-027-87385991