No. | Model | Description | ||
1 | Site: | Supporting piles at tunnel entrance project | ||
2 | Pile Dia: | 800mm | ||
3 | Pile depth: | 10M | ||
4 | Hammer: | PERAK240 24” hammer | ||
5 | Drill bit: | MXB750 | ||
6 | Compressor: | 24KGS,90 Cube or more | ||
7 | Drill pipe: | Dia 720MM Hex connector drill rod | ||
8 | Pile type: | Filling pile | ||
9 | Drilling rate: | 2 hr/pile | ||
10 | Formation: | Surface layer 2m, granite formation after 2m, 120Mpa hardness. |